Upgrading a plant drainage system

fiche drainThis project was to solve the problem of overflowing sanitary drains in a production area in Dairy sector, following the standards and recommendations of CFIA and HACCP standards. Gespro actively managed the construction work while the plant was running, without impacting production. Our team has participated in the diagnosis of current system and the new design, made the construction management and coordinated the work for a new sanitary lift station.

Results :

  • 0 overflow in production area
  • Less risk of contamination
  • Ability to absorb new drainage flow at 100%
  • Compliance with drainage slopes according to HACCP standards

Equipment family involved :  Drain, pump, plumbing